Buying the inventory is the easy part. Wiring it correctly is the job.

We agree on the structure, naming and ownership before anyone starts building. Each asset is checked against the format requirements, then the tracking tags are placed and tested. We build the campaign paused and compare it with the approved sheet line by line. It only goes live after the full build matches the plan. You've seen a pixel never fire or a naming convention stop at the second line item.

A campaign structure another specialist can open and quickly understand, including what is running, why it is named that way, and what it tracks.

A trafficker checking a paused campaign build against a structure sheet on a second screen

Some of the 500+ brands we've worked with

See all references
  • BMW
  • Shell
  • Sporx
  • Aksigorta
  • Grandvision
  • Quick Sigorta

The build sheet holds the structure, creative specs, tag checks and QA sign-offs through launch. AI may compare the build with a naming convention or specification sheet. A person still creates each line item, sets the budget and publishes the campaign.

How we hold ourselves to it

  • Structure and naming are locked before build
  • Every asset must meet the format specs
  • Tracking tags fire on staging first
  • The paused build is checked against the approved sheet
  1. Lock the structure and naming convention

    Decide the account, campaign, and line-item hierarchy, the naming convention, and who owns which piece, before anyone opens the platform to build.

    Locked hierarchy, naming convention and ownership record, agreed before the platform is opened.

    AI assist
    Checks a proposed naming convention for gaps and drafts the structure template.
    Human gate
    Trafficking lead and account owner approve the structure.
    Owners
    Trafficking lead + account owner
  2. Match creative to format specs

    Check every asset's dimensions, weight, duration, and file type against what the format and placement actually require, and flag anything that needs re-cutting before it reaches the build.

    Creative-to-spec check on dimensions, weight, duration and file type, with re-cuts flagged.

    AI assist
    Compares delivered creative against format specs and lists mismatches.
    Human gate
    Creative lead signs off on the spec-checked set.
    Owners
    Creative lead + trafficking specialist
  3. Wire and test tracking tags

    Place every pixel and conversion tag, fire them on staging, and confirm each one reports to the right destination before the campaign gets built around it.

    Staging tag verification proving each pixel and conversion tag reports to the right destination.

    AI assist
    Runs a tag-firing check across staging pages and flags any tag that doesn't report.
    Human gate
    An analytics owner confirms every tag before the build begins.
    Owners
    Analytics owner + trafficking specialist
  4. Build paused and check it against the sheet

    Build every line item without publishing it. Add the targeting, budget, frequency, dates and floor logic, then compare the finished build with the approved sheet line by line.

    Line-by-line QA comparing the paused build with the approved sheet, signed by a second trafficker.

    AI assist
    Diffs the paused build against the build sheet and lists every mismatch.
    Human gate
    A second trafficker signs the build QA before launch.
    Owners
    Trafficking lead + second trafficker
  5. Activate and confirm delivery is real

    Turn on only what's approved, then confirm within the first hours that impressions are actually posting, tags are firing on the live domain, and budget is pacing the way the plan expected.

    First-hours confirmation that impressions post, tags fire on the live domain and budget paces to plan.

    AI assist
    Watches early delivery and flags a line item that isn't posting or pacing as planned.
    Human gate
    The trafficking lead approves go-live and owns the first-day check.
    Owners
    Trafficking lead + account owner
  6. Record what shipped and what to check next time

    Write down the final structure, any deviation from the original sheet and why, and what the next build should copy or avoid.

    Shipped-structure record naming every deviation from the sheet and its reason.

    AI assist
    Drafts a build log from the approved structure and QA notes.
    Human gate
    Trafficking lead signs the record. Account owner reviews deviations.
    Owners
    Trafficking lead + account owner

The handover explains the campaign structure and the checks behind every active line item.

  • Build sheet and structure map

    The full naming convention, line-item hierarchy, and ownership record for the campaign, current as of launch.

    Accepted when

    The naming convention, line-item hierarchy and ownership record are current as of launch, not as of the kickoff draft.

    Cadence: Launch and on change

  • Tag verification log

    Every tracking pixel and conversion tag, where it was tested on staging before launch, and its live-domain recheck in the first hours of delivery.

    Accepted when

    Every tag has a staging test and a live-domain recheck in the first hours of delivery.

    Cadence: Staging, then first hours live

  • Build QA checklist

    The line-by-line comparison between the approved sheet and the paused build, signed by a second trafficker.

    Accepted when

    A second trafficker signed the line-by-line comparison between the approved sheet and the paused build.

    Cadence: Every launch

  • First-week delivery brief

    A record of impression delivery, pacing, tag behavior, and any adjustment made during the first week.

    Accepted when

    Impression delivery, pacing and tag behavior are recorded with every adjustment made during the first week.

    Cadence: After first week

A wrong setting may keep running without an obvious error. A mistyped audience ID, a frequency cap applied to the wrong line item, or a tag still pointing to a staging container may not look unusual in a status report. Spend and impressions continue, so the campaign appears active. The issue may only become visible weeks later, when conversion data does not match a campaign that appeared to be delivering normally.

A good fit when

  • A new seat, vertical, or complex line-item hierarchy is being built, but naming and ownership are not settled enough for another trafficker to follow.
  • Naming and tagging rules can be agreed before the first line item is built, so the paused campaign has one sheet to be checked against.
  • Creative is close to final, yet its dimensions, weight, duration, or file type have not been checked against the placement specs.
  • Line items get copied from an old campaign and only half the settings get rechecked before launch.
  • A tag fires correctly on staging but nobody retests it once the campaign moves to the live domain.
  • Two people build in the same seat with different naming habits, and nobody can tell whose line item is whose.
  • Floor prices, caps, and targeting get set once at launch and never checked against actual delivery again.

Better handled as other work when

  • The live structure already matches the approved sheet, while the actual need is a creative refresh inside the existing line items.
  • Nobody's available to sign off a paused build before launch. Skipping that step defeats the point.
  • A guaranteed delivery figure is required before any line item, tag, or targeting rule exists, so setup evidence cannot support that promise.

Paid Search, Paid Social, CRO, and Programmatic each run under a named owner at Zeo. The consultants below are matched to the channel this page is about, so you can see who you'd actually work with.

  • Campaign Manager 360

    the ad server where the paused build gets checked line by line before it goes live

  • Google Tag Manager

    confirms the tracking tags actually fire, and in the right order, before the paused build gets checked against the sheet

Show us the next programmatic build. We'll set the naming, tagging and QA gates before the first line item goes live.
Set up the build

It adds a short QA window. A wrong frequency cap or an untested tag can take minutes to catch while paused and days or weeks after launch.